Join free

Plan & budget · Commercial

Shop and showroom fit-out

What a shop fit-out costs, from a neighbourhood store to a flagship showroom. Display fixtures and lighting make most of the difference.

At the calculator’s starting settings, the total comes to about ₹22.8 lakh – ₹44.3 lakh in Mumbai and ₹18.3 lakh – ₹35.3 lakh in a typical tier-2 city. Change the settings below to fit your project.

Your project

About₹32.8 lakh ↓

Approximate cost

₹22.8 lakh – ₹44.3 lakh

Typically about ₹32.8 lakh

Approximate, from published rates, checked Nov 2026. Get 2–3 quotes before you commit.

Per sq ft
₹3,280 per sq ft
Time on site
2 months

Where the money goes

  • Fit-out

    Civil, ceiling, flooring, lighting, display fixtures

    Shop lighting →

    ₹24.6 lakh₹16.8 lakh – ₹33.6 lakh

  • Signage and billing counter

    ₹1.6 lakh₹1.44 lakh – ₹1.84 lakh

  • GST at 18%

    On work and fees from registered firms

    ₹4.72 lakh₹3.28 lakh – ₹6.38 lakh

  • Contingency (7%)

    For surprises: hidden damage, price rises, changes of mind

    ₹1.84 lakh₹1.28 lakh – ₹2.48 lakh

Stage by stage

How much you'll need at each stage, and when. About 2 months in all.

  1. 1. Brief, layout, design and costing

    ₹1.25 lakh · 2 weeks

    Hire: interior design studioHire: architecture firm

  2. 2. Landlord and building approvals

    ₹31,200 · 2 weeks

    Fit-out manual, drawings, fire layout, work permits

    Hire: architecture firm

  3. 3. Demolition, civil work, partitions, doors

    ₹5.3 lakh · 2 weeks

  4. 4. Air conditioning, electrical, data, fire, plumbing

    ₹8.74 lakh · 3 weeks

    Order AC plant at the design stage: it can take 4–8 weeks

    Hire: mep consultantWires & cablesPipes & plumbing

  5. 5. False ceiling and flooring

    ₹4.06 lakh · 2 weeks

  6. 6. Joinery: pantry, storage, reception

    ₹2.18 lakh · 2 weeks

    Hire: interior design studioPlywood & boardsLaminates & veneers

  7. 7. Furniture and equipment

    ₹4.37 lakh · 1 week

    Order 6–8 weeks ahead

    Hire: interior design studioOffice furniture

  8. 8. IT, AV, security and signage

    ₹6.12 lakh · 1 week

    Hire: mep consultantLighting

  9. 9. Snagging, licences, fire NOC, handover

    ₹46,800 · 1 week

    Start the fire NOC early: it takes 15–30 days

    Hire: architecture firm

Money needed by

Month 2

₹32.8 lakh

Who to talk to

Professionals listed in Mumbai: verified pages first, then alphabetical. Nobody pays to appear.

Interior designers

Looking…

Contractors

Looking…

Lighting designers

Looking…

MEP consultants

Looking…

Good to know

  • Malls add their own costs: a fit-out deposit, design approval and their contractor rules. Ask for the fit-out manual first.

What it comes to, by city

Worked out by this calculator at its starting settings (listed below). A range for planning and comparing quotes, not a quote.

CityTotalTypical
Mumbai₹22.8 lakh – ₹44.3 lakh₹32.8 lakh
Delhi₹21.7 lakh – ₹42 lakh₹31.1 lakh
Bengaluru₹21.1 lakh – ₹40.9 lakh₹30.3 lakh
Pune₹20.6 lakh – ₹39.8 lakh₹29.5 lakh
Hyderabad₹20.6 lakh – ₹39.8 lakh₹29.5 lakh
Chennai₹20.6 lakh – ₹39.8 lakh₹29.5 lakh
A typical tier-2 city₹18.3 lakh – ₹35.3 lakh₹26.2 lakh

Starting settings

Area: 1,000 sq ft · Level: Standard · Shopfront signage: Yes · Include GST (18%): Yes

Common questions

How much does a shop fit-out cost per sq ft in India?

A shop fit-out costs about ₹700–1,500 per sq ft at budget level, ₹1,500–3,000 for a standard branded store or mall unit, and ₹3,000–6,000 or more for a flagship showroom, excluding GST. Published retail data is thin, so treat these as approximate.

What drives the cost of a shop interior?

Display fixtures and lighting are the biggest variable in a shop fit-out budget. The shopfront, signage, security and anti-theft systems, POS, trial rooms and storage also add up, so price each as a separate line.

How much does shop signage cost in India?

Shop signage runs about ₹500–900 per sq ft of sign installed, and ₹1,000 or more for 3D or channel letters. Outdoor signs on the high street usually need municipal permission.

What should I ask a mall before fitting out a unit?

Ask the mall for its fit-out manual, the deposit amount, any approval fees, permitted working hours and the handover condition of the unit, in writing before you sign. Each can change your cost and your opening date.

More in the guide: Shop and showroom fit-out cost in India →

Read before you start

More in commercial

How we work this out

Rules, not AI: your inputs times rates per city, gathered in November 2026 from builders, cement and paint brands, banks, interiors firms and government pages. Most published rates come from firms that sell this work, and they often disagree, so we show a range. Use it to plan and to compare quotes, not as a quote.

Your cart

Shop and showroom fit-out calculator - Design IRL